Kitchens — Nova Scotia, NB & PEI
Kitchen Renovations.
One schedule, one contractor, your kitchen back.
Overview
One schedule, one contractor, your kitchen back.
The thing that makes a kitchen renovation hard is not any single trade. It is that eight of them have to happen in the right order, and every gap between them is a week you are washing dishes in the bathroom. Demolition, framing, electrical, plumbing, drywall, cabinets, template and install counters, tile, trim, paint — miss the sequencing and a three-week job becomes three months of waiting for someone to call back.
We run kitchens as one project with one point of contact, and most of those trades are ours. That is the actual argument for using us: the handoffs happen inside one company instead of between five subcontractors who each have another job going. You are not the one chasing an electrician to come back before the cabinets can go in.
We are also honest about the two things that genuinely control your timeline and are not in our hands: cabinet lead time and counter template. Counters cannot be templated until the cabinets are set and level, and stone fabrication takes its own time after that. We build both into the schedule up front and order cabinetry early, so the wait happens before your kitchen comes apart rather than after.
- Typical timeline
- About 1 week
- Typical range
- $9,000–$18,000
Typical ranges from completed projects, covering labour and materials. Timelines are for work on site once materials are ready. Your quote is confirmed after a site visit. Prices in CAD, excluding HST.

A job we finished
$9,000 · 5 days · everything included
Basement kitchen
What’s included
Six things you are buying.
Concrete deliverables, not adjectives. Each of these is on the quote.

- Layout and work-triangle planning before anything is ordered
- Demolition, framing changes and disposal
- Electrical and plumbing rough-in coordinated with the cabinet drawings
- Cabinetry installed level and true, ready for counter template
- Counter template and install, backsplash tile, lighting and trim
- One schedule and one point of contact across every trade on the job
How it runs
Four stages, start to finish.
- 01
Design and scope
We work through layout, appliance sizes, where the plumbing and electrical actually are, and what moving them costs — then produce a line-item quote against that scope.
- 02
Order and sequence
Cabinetry ordered early because lead time controls the schedule, trades booked in sequence, and a start date set once materials are confirmed rather than hoped for.
- 03
Demolition and rough-in
Strip out, framing changes, electrical and plumbing rough-in to the cabinet drawings, inspection where required, then drywall and paint prep.
- 04
Install and finish
Cabinets set and levelled, counters templated and installed, backsplash tiled, lighting and trim finished, appliances connected, and a deficiency walk with you.
Why Anant
How the job is run, not how good we say we are.
- Seven trades kept in house, so handoffs do not wait on somebody else’s calendar
- A written scope and a quote broken out line by line
- Written change orders — nothing moves the price without your signature
- One point of contact who knows the state of your job
- Permit applications and inspection booking handled by us
- A deficiency walk with you before the final invoice
Where we do this
Kitchens in 21 communities.
Each of these is a page about kitchen renovations in that specific community — local conditions, permitting and all.
Nova Scotia
- Kitchens in Halifax
- Kitchens in Dartmouth
- Kitchens in Bedford
- Kitchens in Lower Sackville
- Kitchens in Cole Harbour
- Kitchens in Hammonds Plains
- Kitchens in Truro
- Kitchens in Amherst
- Kitchens in New Glasgow
- Kitchens in Antigonish
- Kitchens in Sydney
- Kitchens in Glace Bay
- Kitchens in Bridgewater
- Kitchens in Kentville
- Kitchens in Windsor
Prince Edward Island
Often booked together
What usually comes next.
Questions
Kitchens, answered.
A kitchen renovation typically runs $9,000–$18,000 and takes about 1 week on site once materials are ready. That range comes from completed projects and covers labour and materials, in Canadian dollars and excluding HST. Where a job lands inside it depends on the size of the room, what is behind the walls, and the finishes you choose. We confirm your figure in a written, line-by-line quote after a site visit.
The realistic answer depends on scope, but the two fixed constraints are cabinet lead time and counter template — counters cannot be measured until cabinets are installed and level, and fabrication takes time after that. We order cabinetry before demolition so that waiting happens while you still have a kitchen, and we give you a week-by-week schedule rather than a vague range.
Usually yes, and the cost is in the plumbing and electrical rather than the fixture. Moving a sink means new drain and vent runs, which is straightforward on some floor structures and awkward on others. We look at what is under the floor before quoting so the answer is a real number rather than an assumption.
It depends what you are changing. Swapping finishes generally does not; moving walls, altering structure, or new electrical and plumbing generally does. We confirm with your municipality — HRM and the smaller towns each handle it slightly differently — and we handle the application rather than leaving it with you.
Cabinetry is usually the largest single line, then counters, appliances, and how much the layout moves — relocating plumbing and electrical costs far more than keeping them. Whether the floor and ceiling are in scope matters too. We quote line by line so you can see exactly what each decision adds, and change orders are written down before work starts.